Home › Forums › Prep Every Day Check-In Threads › September Check In › Reply To: September Check In
October 3, 2019 at 11:46 am
#23383
Disassembling our Vermont Castings Encore stove, replacing the catalytic combustor, general cleaning and gasket upkeep in prep for winter. For the other stove (an Aspen) I need to replace the pipe up to the ceiling and sweep the rest above the roof because it really needs it.
Got most of my wood in, with the exception of two sources where friends are holding summer cuttings for me to pick up. Lot of bucking and splitting over the next couple of weeks, as well as hauling “too old” wood from the pile to the dump.
So stove upkeep and wood in prep for winter.
